Build days 8-11 were all spent assembling and preping the engines. It took much longer than I expected, but they all look good.
|
|
|
Models
|
|
Written by David
|
|
Wednesday, 21 July 2010 |
|
Day 6 was spent cutting out the rest of the J-1 parts.
Build Day 7 was spent cutting out the stem portions of the J-1's and doing a test build of a single engine.
The larger piece of the engine insert is a bit picky and had to be heavily trimmed and fiddled with to get into the test piece. |
|
|
Models
|
|
Written by David
|
|
Sunday, 18 July 2010 |
|
Well, I got behind on my documentation. But, for days 2-5 work continued on the launch pads. At this point, both are done and waiting for the last bits of glue to dry. |
|
|
|